
In a reinforced-concrete building, a brick wall may not carry the floors above it, yet it can still significantly change how the building responds during an earthquake. That is why opening up a living room, removing masonry panels or replacing walls with large openings requires more than deciding that a wall looks “non-structural”. In Lisbon, many apartment blocks combine concrete frames with masonry infill, so the first decision is to understand how existing walls affect stiffness, weight and likely damage.
Contents
In many reinforced-concrete buildings, columns and beams form the main load-bearing frame. Brick or block walls fill the spaces between those elements, closing façades and separating rooms. They are commonly called infill walls because they fill the openings in the frame.
The name does not make them irrelevant. As a building moves sideways during an earthquake, masonry bearing against the concrete frame can contact columns and beams and act as a compressed diagonal. For a time, that panel becomes part of the route taken by the forces.
Its behaviour depends on details that cannot be judged in a quick visit: the type and thickness of brick, openings in the wall, connections to the frame, condition of mortar joints, old cracking and continuity from one floor to the next. A lightweight plasterboard partition does not react in the same way as ceramic masonry tightly fitted within a concrete bay.
The Portuguese rules for seismic-vulnerability assessment in rehabilitation work reflect this issue: alterations that can change a building’s structural behaviour require their own assessment.
Picture two otherwise identical floors. One has masonry filling every bay between columns; the other has been opened up for parking, a shop or a large living space. The more enclosed floor is usually stiffer laterally. The open floor can move more freely.
That difference can concentrate deformation at one level. It is one reason why very open ground floors need careful attention in seismic assessment. Opening up a single flat can also create asymmetry: a wall removed from one façade, near a stairwell or at one end of the building stops contributing where it previously limited movement.
This does not mean that keeping every wall is always the right answer. Poorly connected masonry can crack, separate from the frame and fall; walls with many doorways or chases may behave differently from continuous panels. The key point is that the arrangement of walls is part of a building’s real behaviour, even where the concrete frame is the primary designed structure.
To understand how forces travel before demolition starts, read how loads travel through a building before you open an opening.
| Situation | Effect that may need assessment | Prudent decision |
|---|---|---|
| Continuous masonry panel between columns | May increase lateral stiffness in that bay | Record its location, thickness and openings before any work |
| Open ground floor for parking or commercial use | May concentrate movement in the more open level | Seek structural assessment before removing or changing further walls |
| New wide doorway in an infill wall | Reduces continuity and changes the way forces are transferred | Set out the opening, lintel and detail with a qualified professional |
| Cracked wall or wall separating from the frame | May indicate movement, deterioration or inadequate connection | Do not repair only the finish without a diagnosis |
The first question is not “does this wall hold up the slab?”. It is “what is here, and what changes if it is removed?”. In an apartment, the work starts by locating columns, beams, walls aligned in adjacent floors and any elements that may not be visible on the flat’s drawings.
In its seismic-strengthening guidance, Lisbon City Council warns about the so-called “miracle beam”: indiscriminately replacing walls with a beam can reduce earthquake resistance in masonry buildings. For concrete-frame buildings, the lesson still applies: a local solution should not be selected without understanding its effect on the whole system.

Not every alteration means removing an entire wall. A chase for pipework, a recessed cabinet or a new doorway also interrupts material and can weaken a panel that was previously continuous. In an infill wall, an opening changes the way masonry transfers compression towards the corners of the concrete frame.
The common site risks are straightforward: cutting close to a column without knowing where services run, removing most of a wall and leaving a narrow unstable strip, or opening first and deciding later how it will be finished. A lintel may solve the local stability of an opening, but it does not by itself answer the wider question of changed stiffness.
It is also important to distinguish internal walls from façade panels. Work to a façade can involve weatherproofing, insulation, fire behaviour and condominium rules, alongside the structural issue. Where common elements or the building’s external appearance are affected, approvals should be dealt with before materials are ordered.
For substantial work, confirm whether the area being altered or the change in building behaviour may trigger a seismic report. Portaria no. 302/2019 includes, among other cases, work that changes structural behaviour and interventions whose area or cost exceeds stated thresholds.
Mainland Portugal has intermediate seismicity in global terms, and activity is not evenly distributed across the country. The Portuguese Institute for Sea and Atmosphere explains where earthquakes occur in Portugal, including the relevance of the area southwest of Cape Saint Vincent and the southern Algarve, among other active areas.
For someone renovating in Lisbon, the consequence is not to predict an earthquake on a particular date; that cannot be done. It is to avoid ordinary building work reducing, through lack of assessment, the capacity a building had to respond to horizontal movement. Buildings from different periods, with different structures and accumulated alterations, should not be treated as though they all have the same resisting system.
The year of construction is a clue, not a guarantee. Lisbon City Council notes that concrete buildings built after 1983 were already designed under seismic-calculation requirements, although damage can still occur in a moderate or strong earthquake. In earlier buildings, especially where layouts have been repeatedly altered, the need for a technical reading is usually greater.
The article on open ground floors and seismic response helps identify a situation where an uneven distribution of walls and openings can be especially important.
Some finishing tasks can be planned as limited DIY: removing skirting boards, dismantling loose furniture, repairing paint after work has been approved, or carrying out very small exploratory openings under direction. Demolishing masonry, forming openings, cutting walls near columns or changing façades do not belong in that category.
Call a civil engineer with structural competence if any of the following applies:
The useful request is not “tell me whether I can knock it down”. Provide drawings, photographs, the precise location of the opening and the intended layout. Ask for the solution to be translated into design information, quantities and a work sequence. The contractor can then know what to demolish, what to support, what to build and when to check the result.
Key takeaways
If your Lisbon renovation includes demolition, new openings or layout changes, ask Obra Lisboa for a work plan that starts with the technical information and the right order of decisions.
Sources and further reading
Editorial image; it does not depict an Obra Lisboa project.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI usa referências técnicas, sem enviar nome, email, telefone ou mensagem do pedido. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição usa referências técnicas para associar pedidos aos anúncios, sem enviar nome, email, telefone ou mensagem. É opcional e pode ser desativada a qualquer momento.