Yes, in most residential projects it makes sense to plan air-conditioning pre-installation before walls and ceilings are closed. This preparation allows pipework, drains and connection boxes to be concealed, coordinates the electrical work and avoids later intervention in finished surfaces. The outcome always depends on the design, the selected system and the manufacturer’s instructions.
The decision should be made early, alongside architecture, technical design and site execution. In addition to the physical installation, it is important to confirm who will carry out the final connection of the equipment and whether they hold the certification applicable to work on systems containing fluorinated gases.
A well-defined pre-installation prepares the elements that will remain concealed, so that the equipment can later be installed without opening walls or ceilings. During construction, the following items are commonly planned:
These details become difficult and costly to correct once finishes are complete. A poorly positioned box, a drain without a workable route or a run that conflicts with beams, cabinetry or lighting can require finished surfaces to be opened. It is therefore worth describing them in the design and quote rather than accepting the general phrase “air-conditioning preparation”.
There is no single price for pre-installation. The cost depends on the number of rooms, the type of system, the routes required and how easily the work can be carried out during construction. A quote can only be compared properly when it clearly identifies what is included.
The main cost factors are:
Including pre-installation in the overall construction sequence helps coordinate electrics, plumbing, suspended ceilings, finishes and joinery. When requesting quotes, compare routes, boxes, drainage, insulation, electrics, access and finish reinstatement — not only a total figure or a price per unit.
A useful quote breaks down routes, drainage, electrical work, passage solutions and reinstatement. That makes it easier to understand what is included and to compare proposals on equivalent terms.
When two quotes differ significantly, the reason may be omitted items: insulation, pre-installation boxes, line identification, drainage provision, electrical supply or finishing work.
The most favourable time is before walls and suspended ceilings are closed. At that stage, pipework, drains and boxes can be concealed without cutting or patching. In new construction, this coordination follows the installation of the other services; in a renovation, it follows demolition, wall chasing and the construction of new partitions.
Delaying the decision usually has two consequences. The first is practical: completed elements may need to be removed or remade. The second is aesthetic and functional: surface trunking may be needed, routes may be less direct, and indoor units may end up where space remains rather than where they best suit the room layout.
The position of the units should be decided together with the architectural and interior design. An indoor unit should not be compromised by curtains, wardrobes, lighting or obstacles to airflow. Its position, accessibility and service routes should appear on the drawings before finishes begin.
Before authorising closure, review these points with the site manager and the technicians involved:
Pipe sizing, diameters, permitted lengths, level differences, electrical supply and testing should not be set through a generic rule of thumb. They must follow the design, the selected system and the manufacturer’s technical documentation.
Professional tip: photograph every visible route and store the images with the final drawings. This record can prevent unnecessary opening-up during future maintenance.
For more on discharge arrangements, see our guide to air-conditioning condensate on balconies.
To compare proposals fairly, give every bidder the same information: available drawings, planned unit locations, the system under consideration and the constraints of the work. These questions help clarify the scope:
In Portugal, the Portuguese Environment Agency publishes lists of certified technicians and companies for work on fixed refrigeration, air-conditioning and heat-pump equipment containing fluorinated gases. Confirm the applicable qualification of whoever will install, maintain, repair or dismantle the system, and keep that information with the project documentation.
Professional tip: use the request for quotation to review all services that will be concealed. A coordinated enquiry reduces conflicts between work carried out at different stages.
Pre-installation is not the same for every system. Choosing, or at least narrowing down, the solution before the building work is closed helps avoid incompatibilities with routes and available outdoor-unit space.
With an individual split, each indoor unit connects to its own outdoor unit. The pre-installation is usually more direct, but it can multiply outdoor equipment and calls for careful consideration of space, fixings, noise, access and building rules.
With a multi-split, one outdoor unit serves several indoor units. It reduces the amount of outdoor equipment, but brings multiple lines together at one point and requires particular attention to routes. Limits on length, height difference and unit combinations vary by manufacturer and model.
In VRF systems, more common in larger homes or buildings, there is a main pipe network with branches. The solution needs more detailed technical coordination, particularly with shafts, structure, maintenance access and HVAC design.

Rather than routinely oversizing the installation, define with the designer the scenario you want to prepare for and document it. If future phases are possible, assess routes, space allowances and compatibility with the selected system in advance. Obra Lisboa provides information on its services and construction coordination for owners who want to include these decisions in a broader technical process.
Air-conditioning performance does not depend on the appliance alone. Routes, insulation, drainage, electrical supply, installation quality and unit location all affect system operation and maintenance.
Pipework installed outside the manufacturer’s stated conditions, discontinuous insulation or inadequate drainage can contribute to losses, condensation, noise, dripping or operating difficulties. An unsuitable electrical circuit may also create safety and operational issues. These risks should be addressed in the design and checked during construction.
The location of indoor units matters too. A unit behind an obstruction, too close to a wardrobe or without maintenance clearance may distribute air less effectively and make future servicing more difficult.
If you are planning other technical systems at the same time, such as domestic hot water, it is important to coordinate space, routes, electrical supply and access. Our guide to heat pumps for hot water during renovation explains some of those connections.
Most pre-installation work is concealed, which makes access, route identification and construction records important. A few simple checks can help identify issues early:
Where condensate discharges onto a balcony or external area, make sure it does not drip onto walkways, neighbouring properties or façade elements, and does not create leaks. The principles of falls and drainage are similar to those covered in our article on window sills, slopes and drainage.
The best maintenance aid is the record made during construction: with routes photographed and identified, any intervention can be planned more accurately and with less exploratory demolition.
Pre-installation stops being a last-minute detail when it is treated as part of the home’s design. Unit locations, routes, drainage, electrics, suspended ceilings and fitted furniture should be coordinated before the work is concealed.
The wider construction framework also needs checking. Changes to façades, roofs, common areas or structural elements may require their own assessment and, depending on the case, communication with or control by the competent authorities and the condominium. Specialist designs help coordinate technical systems with the wider project, but do not replace checking the rules that apply to the specific property.
For equipment containing fluorinated gases, technician and company certification should be checked in the lists published by the Portuguese Environment Agency. Any energy-efficiency support depends on the notices, conditions and applications in force, and should be checked directly before it is included in a budget.

Pre-installation benefits from clear coordination between design, technical packages and construction. To request a proposal, gather the available drawings, state whether the work is new construction or renovation, identify the rooms to be conditioned and explain whether a system or brand has already been selected. See Obra Lisboa’s services to frame your enquiry.
The price varies with the number of rooms, the system type, the routes and the ease of carrying out the work during construction. Rather than comparing only prices per appliance, ask for a proposal describing pipework, boxes, drainage, insulation, electrics, access and any finish reinstatement.
It commonly includes refrigerant pipework and pre-installation boxes, a condensate-drain route, electrical provision for the equipment, preparation of the outdoor-unit location and pipe insulation. The final scope should follow the design and the technical documentation for the selected system.
The rules depend on the type of work, the building, the outdoor-unit location and the equipment. For work on fixed equipment containing fluorinated gases, check the applicable certification of technicians and companies in the lists published by the Portuguese Environment Agency. Also check condominium rules and any planning requirements that may apply to the property.
Dimensions depend on the manufacturer, model and system type; there is no universal size. Check the equipment data sheet before closing the wall and include dimensions, routes and maintenance access in the construction drawings.
For sizing, routes, connections and maintenance, consult the design and the documentation for the selected equipment.
Privacidade e controlo
Usamos cookies essenciais para o funcionamento do site. Com a sua autorização, podemos também medir a utilização e os resultados dos anúncios. A medição de publicidade com a OpenAI pode incluir identificadores técnicos e hashes de dados de contacto. Pode aceitar, rejeitar ou gerir cada categoria. Consulte a Política de Privacidade e a Política de Cookies.
Necessários para segurança, navegação e memorização da sua escolha.
Ajuda a medir utilização e desempenho sem enviar dados de contacto.
Permite medir campanhas, incluindo anúncios no ChatGPT. Com a OpenAI, a medição pode usar identificadores técnicos e hashes de dados de contacto para associar pedidos aos anúncios. É opcional e pode ser desativada a qualquer momento.